Royal Dutch Shell Plc  .com Rotating Header Image

Analytical Information Agency (Moscow): Sakhalin Energy has completed the construction of Russia’s first LNG loading terminal

Sakhalin Energy has completed the construction of the first LNG loading berth in Russia, as the Company informs.

The berth for the loading of liquefied natural gas (LNG) is one of the integral elements of the LNG production plant that is under construction in the south of Sakhalin.

The berth can receive tankers with tonnage from 18,000 cubic meters to 145,000 cubic meters.

Sakhalin Energy is the operator of the Sakhalin-2 project. Under this project, the Piltun-Actokhskoye and Lunskoye Fields are being developed, their mineable reserves being 17.3 trillion cubic feet of gas and 1 billion barrels of oil.
 

This website and sisters royaldutchshellgroup.com, shellnazihistory.com, royaldutchshell.website, johndonovan.website, and shellnews.net, are owned by John Donovan. There is also a Wikipedia segment.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Comment Rules

  • Please show respect to the opinions of others no matter how seemingly far-fetched.
  • Abusive, foul language, and/or divisive comments may be deleted without notice.
  • Each blog member is allowed limited comments, as displayed above the comment box.
  • Comments must be limited to the number of words displayed above the comment box.
  • Please limit one comment after any comment posted per post.