MOSCOW, September 10. /FIS/. Gazprom OJSC and the shareholders of ‘Sakhalin-2’ are conducting talks with Japan Bank for International Cooperation on the project financing. Under ‘Sakhalin-2’ project under development are two deposits – Piltun-Ostokhskoye oil deposit and Lunskoye condensed gas deposit with the total recoverable reserves of 150 million tons of oil (1 billion barrels) and 500 billion cu. m. of gas.
http://www.engl.fis.ru/news/?nid=22517