MORE CORRIB GAS PROJECT LEAKED INTERNAL EMAILS

MORE CORRIB GAS PROJECT INTERNAL EMAILS SUPPLIED BY A MEMBER OF THE “CELTIC TIGER 5” – A CLAIMED GROUP OF DISSIDENT SHELL EMPLOYEES

From: Grant David
Sent: 29 September 1999 13:58
To: Jones Ifor
Subject: RE: Corrib Well Fluid Analysis

Lambo

Due to the very short half-life of radon, it needs to be measured ideally within about 4 days of the sample being taken.  The samples currently held by Core Lab will therefore be of no further use in determining radon levels.

Because of this problem, we made arrangements to measure the radon levels offshore at the time of sampling.  The level measured was 26.9 Beq/m3 (“normal” formation radon concentrations are quoted by the lab as being in the range 10 – 100 Beq/m3).

Unfortunately, only one measurement was made.  There is nothing we can do about this now but we have taken steps to ensure that at least three measurements are made on the Shannon well if it is tested.

Hope this is of use.  Please call me if you need any further information.

Regards

David Grant

**************************************************

From: Simpson Mike
Sent: 10 October 2000 11:25
To: Adlam, John; Hamilton, Peter; O’Cathain, Brian
Subject: KDR present/BGE HoT

John/Peter – see KDR present, Peter – see attached HoT for tariff calculation and confirmation of our telecon re BGE meeting on Thursday 12th Oct as follows;

Include terminal metering, odourisation etc into the Link budget (acknowledging that Lambo has included this in the terminal EPC tender) – BGE will own and pay 15% ,  we transfer 85% of the capital cost to tariff.  Also encourage BGE to include AGI/Letdown station at Galway in the Ringmain costs – ie removing capital completely (Gerry Keane indicated off the record that this was what they intended to do).

Also since the difference between 26 and 30” in now only £4.5 mm – I would work on the basis that it is 30” , it gives a lot more linepack and if we can get BGE to pay their 15% so much the better.  If we decide on a 26” then we can substitute the lower cost at a later date.  You might enquire (subtly!) when we need to fix the diameter.

Regards

Mike
__________________________
Mike Simpson
Commercial Manager
Enterprise Energy Ireland Limited
4th Floor
Embassy House
Herbert Park Lane
Ballsbridge
Dublin 4
Tel:    01 665 2218
Fax:    01 665 2219
Registered in Ireland No. 316588

This website and sisters royaldutchshellgroup.com, shellnazihistory.com, royaldutchshell.website, johndonovan.website, and shellnews.net, are owned by John Donovan. There is also a Wikipedia segment.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Comment Rules

  • Please show respect to the opinions of others no matter how seemingly far-fetched.
  • Abusive, foul language, and/or divisive comments may be deleted without notice.
  • Each blog member is allowed limited comments, as displayed above the comment box.
  • Comments must be limited to the number of words displayed above the comment box.
  • Please limit one comment after any comment posted per post.