Royal Dutch Shell Plc  .com Rotating Header Image

Shell’s Prelude FLNG to remain offline for most of Q1: Ben van Beurden

COMING SOON: The Hindenburg, The Titanic and Shell Prelude FLNG (in collaboration with Bill Campbell)

**********************************************************

upstreamonline.com article

Shell’s Prelude FLNG to remain offline for most of Q1: Ben van Beurden

By Josh Lewis in Perth: 4 FEB 2022

Prelude has been offline since an electrical fire in December last year resulted in a complete loss of power at the facility, with a subsequent report into the incident suggesting the FLNG vessel was at risk of ‘catastrophic failure’ as a result of the fire and subsequent power outages.

While Shell has not given a definitive timeline of when it anticipates to have its flagship FLNG development back up and running, chief executive Ben van Beurden conceded in a media call on Thursday the operator expected Prelude to be offline “for most of Q1”.

FULL ARTICLE

This website and sisters royaldutchshellgroup.com, shellnazihistory.com, royaldutchshell.website, johndonovan.website, and shellnews.net, are owned by John Donovan. There is also a Wikipedia segment.

Comments are closed.

Comment Rules

  • Please show respect to the opinions of others no matter how seemingly far-fetched.
  • Abusive, foul language, and/or divisive comments may be deleted without notice.
  • Each blog member is allowed limited comments, as displayed above the comment box.
  • Comments must be limited to the number of words displayed above the comment box.
  • Please limit one comment after any comment posted per post.