
THE SHELL LEAKS FILES: 6 SEPTEMBER 2026
SLF-2007-049
The Sakhalin Papers XXXIX: The Survey Before the Platform — WGWAP Helps Sakhalin Energy Search for PA-C While Refusing to Endorse It
Before Sakhalin Energy could decide whether to build a third offshore platform, it first had to establish where that platform might safely stand. That meant another seismic operation beside the Western Gray Whale feeding grounds. The resulting episode exposed one of the most difficult questions in the entire WGWAP experiment: could independent scientists help Shell’s Sakhalin venture conduct the survey more safely without becoming part of the machinery advancing the very development they had warned should not yet proceed?
Archive reference: SLF-2007-049
Collection: The Sakhalin Papers
Principal scientific records: Western Gray Whale Advisory Panel, Report of the Eleventh Meeting, February 2012; WGWAP Noise Task Force records, November 2011; Report of the Twelfth Meeting, November 2012
Contemporaneous reporting: WWF campaign material, February 2012; AFP, 9 February 2012
Later scientific record: IUCN, “Keeping whales safe in sound”, January 2014
Evidence standard: The South Piltun/PA-C development remained under study during the principal period examined. WGWAP was an independent scientific advisory body, not a regulator. Its participation in survey design and mitigation is not characterised as approval of the proposed platform. WWF statements concerning extinction risk and lender responsibility are identified as campaign positions.



























