THE SHELL LEAKS FILES — 28 NOVEMBER 2026
Archive reference: SLF-2007-132
The Sakhalin Papers CXXII: When Russia Refused Permission to Listen — An Independent Investigation into the 2018 Acoustic Monitoring Permit and the Conflict Between State Authority and Whale Protection
In the spring of 2018, the Russian authorities refused permission for scientists to deploy underwater acoustic monitoring equipment near the feeding grounds of Sakhalin’s endangered gray whales. Sakhalin Energy proceeded with its seismic survey using computer modelling instead. During the operation, the company discovered that the actual acoustic equipment differed from the configuration used in its calculations. Subsequently, adverse weather prompted the company to relax certain remaining protective measures. The independent scientific advisers expressed concern, while acknowledging the operator’s considerable efforts and constructive cooperation.
AN INDEPENDENT DOCUMENTARY INVESTIGATION
By the Donovan–Shell Archive
Researched and drafted with assistance from ChatGPT. Based on authenticated Shell regulatory filings, original Sakhalin Energy correspondence, bilingual scientific statements, contemporaneous reporting, independent evaluations, recovered advisory panel reports and British High Court records.
Publication date: 28 November 2026
Collection: The Sakhalin Papers — Shell, Gazprom and Russia
Previous instalment: SLF-2007-131 — Listening to the Whales
INTRODUCTION: THE GOVERNMENT THAT ALLOWED THE SURVEY BUT PREVENTED AN IMPORTANT PART OF ITS ENVIRONMENTAL MONITORING
The historical relationship between Shell, the Russian government and the endangered gray whales of Sakhalin is frequently examined through the events of 2006 and 2007.
During that period, Russian environmental regulatory intervention coincided with negotiations that eventually resulted in Gazprom acquiring majority control of Sakhalin Energy.
Eleven years later, another episode raised a substantially different question about the exercise of Russian governmental authority.
In 2018, Sakhalin Energy and its independent scientific advisers had invested considerable resources in developing environmental safeguards for an offshore seismic survey.
Underwater acoustic measurements were central to the agreed arrangements.
The equipment would enable scientists to compare predicted noise levels with actual measurements obtained near the whales’ feeding grounds.
But the necessary Russian governmental authorisation was refused.
No explanation for the refusal was communicated in the documents examined for this investigation.
The company subsequently obtained environmental approval for its seismic operations and proceeded under a modified monitoring and mitigation programme.
The independent scientists accepted the practical value of the alternative arrangements but refused to concede that acoustic monitoring was an optional environmental safeguard.
What happened during the survey made their concern particularly relevant.
An error was discovered in the computer modelling upon which the operator had become dependent.
Later, adverse weather and operational delays resulted in certain additional protective provisions being relaxed.
The surviving documentation reveals an unusually instructive example of the competing influences of scientific advice, corporate decision-making, environmental conditions and governmental authority.
PART ONE: SHELL’S HISTORICAL POSITION IN THE PROJECT
1. The authenticated corporate ownership record
Royal Dutch Shell’s original 2007 Annual Report and Form 20-F establishes that the company completed the reduction of its Sakhalin Energy shareholding from 55% to 27.5% on 18 April 2007.
Shell received $4.1 billion for the shares transferred.
Gazprom acquired majority control, while Sakhalin Energy remained the project operator.
The distinction is essential when examining the events of 2018.
Shell retained a substantial economic interest in Sakhalin II, but it was no longer the controlling shareholder.
The documents examined do not establish that Shell directed the Russian government’s refusal of the acoustic monitoring permit or independently authorised the subsequent operational decisions.
Authenticated Shell source: Royal Dutch Shell plc — Annual Report and Form 20-F 2007, printed pages 17–18, United States Securities and Exchange Commission.
SEC
Shell’s 2018 Annual Report and Form 20-F continued to identify its 27.5% interest in the Sakhalin II development.
Additional corporate source: Shell Annual Report and Form 20-F 2018, printed page 31 — archived reproduction.
20-F annual report 2018
PART TWO: MARCH 2017 — A RENEWED ENVIRONMENTAL COMMITMENT
2. Five more years of independent scientific advice
On 7 March 2017, IUCN announced that it had concluded a new agreement with Sakhalin Energy covering the period 2017–2021.
The Western Gray Whale Advisory Panel would continue providing independent advice concerning the company’s activities.
Among the expressly identified priorities was the preparation of environmental safeguards for the forthcoming seismic survey.
Other priorities included the joint whale research programme, the company’s Marine Mammal Protection Plan and its implementation of international environmental performance standards.
This was a public commitment to continuing scientific cooperation.
It also establishes that the planning of the 2018 seismic programme was not an improvised environmental exercise undertaken immediately before industrial operations commenced.
Contemporaneous institutional source: IUCN and Sakhalin Energy Renew Their Commitment to Protect Western Gray Whales, 7 March 2017.
IUCN
PART THREE: THE LESSONS OF THE 2015 SEISMIC SURVEY
3. Independent observation had already demonstrated its value
The 2018 planning process drew upon experience accumulated during earlier seismic operations.
In June 2016, IUCN published an assessment by its independent observer, Grigory Tsidulko, concerning Sakhalin Energy’s 2015 seismic survey.
The observer had been permitted to examine the company’s field operations, including its acoustic monitoring arrangements.
His overall assessment was favourable concerning implementation of the applicable monitoring and mitigation plan, although he identified opportunities for improvement.
IUCN regarded independent observation as an important contribution to environmental transparency.
The experience demonstrated that an industrial operator could provide independent scientists with meaningful access to its monitoring arrangements without relinquishing operational responsibility.
Primary institutional source: IUCN — Independent Observer Report on Whale Protection During the 2015 Sakhalin Seismic Survey, 15 June 2016.
IUCN
PART FOUR: THE ORIGINAL PURPOSE OF UNDERWATER ACOUSTIC MONITORING
4. Two complementary scientific functions
Underwater acoustic recorders were intended to fulfil two important functions during the 2018 survey.
Real-time monitoring would provide information relevant to operational decisions while the industrial activities were underway.
Archival monitoring would preserve measurements for subsequent scientific examination.
The first function was intended to assist immediate environmental protection.
The second would help determine whether the protective arrangements had been effective and how they might be improved for future operations.
These are complementary rather than interchangeable functions.
A computer model predicts the transmission of sound through the marine environment. A submerged acoustic sensor measures the sound that actually reaches its location.
Comparing the two enables scientists to identify discrepancies between predicted and observed conditions.
Without direct measurements, uncertainty remains concerning the accuracy of the predictions under the particular environmental and operational circumstances encountered.
PART FIVE: APRIL 2018 — AN EMERGENCY MEETING OF THE SCIENTISTS
5. The original bilingual statement identifies the Russian ministry
One of the most significant documents examined for today’s investigation is a six-page bilingual statement issued by the Western Gray Whale Advisory Panel on 17 May 2018.
Its opening page records an emergency teleconference held on 30 April.
The meeting had been convened following a decision attributed to the Russian Federation’s Ministry of Education and Science, specifically its Department of Science and Technology.
The authorities had refused the application by the National Scientific Marine Biology Centre for permission to deploy acoustic sensors.
The refusal affected both real-time and archival recording equipment.
The panel had learned of the problem in late March.
The refusal was presented to the scientists as final and not open to negotiation or appeal.
That was how the decision was characterised in the contemporaneous documentation. Its actual legal status under Russian administrative law has not been independently established.
Primary documentary source: Western Gray Whale Advisory Panel — Statement Related to Acoustic Monitoring During Sakhalin Energy’s 2018 Seismic Survey, 17 May 2018, first two pages (PDF).
The original English and Russian text has been visually examined for this investigation.
iucn-csg.org
6. The scientists even considered allowing the Russian security authorities to control the recordings
The same document records a particularly revealing discussion.
The scientists explored whether it might be possible to deploy at least one acoustic monitoring buoy under arrangements giving Russian security authorities strict control over the resulting data.
The company explained that it lacked the necessary communication channels to pursue such a proposal within the available time.
This demonstrates that the scientists were prepared to consider significant restrictions on access to the recordings if that would enable some environmental monitoring to proceed.
Their immediate objective was to secure the measurements needed to help protect the whales.
The proposal does not establish that Russian military or intelligence authorities were responsible for the original permit refusal.
That distinction must be preserved.
PART SIX: WHY POSTPONEMENT ALSO PRESENTED DIFFICULTIES
7. The competing industrial schedules
The panel’s statement examined the practical consequences of postponing Sakhalin Energy’s survey.
Exxon Neftegas was understood to be planning seismic operations in 2019.
Moving Sakhalin Energy’s programme into that year could therefore recreate the cumulative industrial-noise problems encountered in 2015.
Other planned industrial activities potentially complicated postponement until 2020.
These circumstances presented a genuine conservation dilemma.
Proceeding in 2018 would mean undertaking the survey without an important monitoring safeguard.
Postponement could create other environmental and operational difficulties.
The scientists recognised the complexity of the situation without abandoning their position on the importance of acoustic measurements.
Primary source: WGWAP Statement of 17 May 2018, third PDF page.
iucn-csg.org
PART SEVEN: 24 MAY 2018 — SAKHALIN ENERGY’S ORIGINAL RESPONSE
8. The operator maintained that it had been ready to implement the agreed plan
The original Sakhalin Energy response survives in the recovered scientific archive.
The company stated:
“the Company was ready for its full implementation.”
It identified two scientific service providers affected by the permitting problem:
-
The National Scientific Marine Biology Centre.
-
The Pacific Oceanological Institute.
The company reported that no alternative permitting route was then available.
Its response also maintained that earlier monitoring had not identified measurable adverse effects on gray whales resulting from its seismic surveys between 2010 and 2015.
It referred to the continuing growth in the number of whales visiting Sakhalin.
Those statements represent the operator’s interpretation of its historical monitoring results.
The company proposed additional precautionary adjustments to its acoustic modelling and committed itself to implementing the other agreed environmental measures.
Original corporate source: Sakhalin Energy — Response to the WGWAP Statement, received 24 May 2018 (PDF).
The original document has been visually examined.
iucn-csg.org
PART EIGHT: THE SCIENTISTS RECOGNISED THE COMPANY’S GOOD FAITH
9. The response of the advisory panel’s co-chairs
The panel’s co-chairs responded immediately following receipt of Sakhalin Energy’s explanation.
They acknowledged the efforts made by the parties to resolve the permitting difficulty.
They also welcomed the precautionary modifications proposed by the company’s acoustic consultants, JASCO.
But their scientific reservation remained explicit:
“the effectiveness of this approach cannot be confirmed without measurements in the field.”
They supported continued independent observation and continued involvement by the advisory group.
Importantly, the co-chairs explained that they had issued their immediate response without consulting the full panel because of the limited time available.
Their statement must therefore be attributed accurately.
It was not an unconditional endorsement of the modified survey arrangements by every member of the scientific panel.
Primary scientific source: WGWAP Co-Chairs — Response to Sakhalin Energy, May 2018, bilingual original (PDF).
iucn-csg.org
PART NINE: 9 JUNE 2018 — THE REVISED 92-PAGE MONITORING PLAN
10. The documentary record of the compromise
The revised Monitoring and Mitigation Plan was dated 9 June 2018.
It remains available as a 92-page document.
The plan covered a proposed seismic survey of approximately 350 square kilometres around the Piltun and Astokh offshore platforms.
The expected duration was approximately 42 days, subject to operational and environmental uncertainties.
Section 2.2, on printed page 5, specifically addressed the permit refusal.
It recorded the replacement of direct acoustic monitoring with adjusted modelling.
The company also accepted that the circumstances of 2018 should not establish a precedent for subsequent surveys.
This last commitment is particularly important.
The revised arrangements were presented as an exceptional response to an exceptional permitting problem, not as a permanent abandonment of acoustic monitoring.
Primary documentary source: Updated Monitoring and Mitigation Plan for the 2018 Piltun-Astokh 4D Seismic Survey, 9 June 2018, printed pages 2–5 (PDF).
iucn-csg.org
PART TEN: THE ADDITIONAL TWO-DECIBEL SAFETY MARGIN
11. How the consultants attempted to compensate for missing measurements
The revised plan included a statistical comparison between earlier acoustic measurements and the updated computer predictions.
The consultants introduced a fixed precautionary adjustment of +2 decibels to the modelled results.
The intention was to reduce the risk of underestimating noise exposure near the whales.
The historical numerical comparisons require careful interpretation.
| Modelling assessment | Reported historical comparison |
|---|---|
| Before the additional precautionary adjustment | 4% of relevant pulse levels underestimated by 3 dB or more |
| After the additional precautionary adjustment | 1% underestimated by 2 dB or more |
The two percentages relate to different error thresholds.
They do not establish that the additional adjustment reduced the risk of harm to whales by 75%.
Nor do they represent direct measurements obtained during the 2018 survey.
The revised approach was a technically informed attempt to reduce uncertainty using existing evidence.
But it could not provide direct confirmation of the actual noise levels encountered in 2018.
Primary technical source: Revised Monitoring and Mitigation Plan, printed pages 8–9, section 3.2.1.
iucn-csg.org
PART ELEVEN: THE MODELLING ERROR THAT WAS DISCOVERED DURING THE SURVEY
12. The actual equipment configuration differed from the model
A particularly significant finding appears in the report of the advisory panel’s nineteenth meeting, held in Moscow between 14 and 16 November 2018.
During the survey, Sakhalin Energy discovered a discrepancy between the actual arrangement of its seismic airgun equipment and the configuration used in the acoustic calculations.
The difference affected the transmission of sound laterally through the water, a matter directly relevant to potential disturbance of the whales.
The company promptly notified the scientific advisers and undertook revised modelling.
A retrospective assessment concluded that the discrepancy had not resulted in any missed whale-related shutdowns.
This favourable conclusion must be acknowledged.
However, it was a retrospective modelling assessment, not a conclusion independently corroborated by contemporaneous underwater acoustic measurements.
The panel reiterated that future modelling must use the actual equipment specifications.
Primary documentary source: Western Gray Whale Advisory Panel — Nineteenth Meeting Report, November 2018, printed page 13, section 3.4.1 (PDF).
iucn-csg.org
PART TWELVE: THE WEATHER CREATED A SECOND ENVIRONMENTAL PROBLEM
13. Conditions deteriorated beyond those anticipated
The 2018 operation encountered unusually difficult environmental conditions.
Late sea-ice retreat delayed its commencement.
Persistent poor visibility subsequently complicated visual whale monitoring.
This created a further conflict between the objectives of completing the survey before the main feeding season and protecting individual whales already present.
Those weather conditions were not within the company’s control.
The operational response to them, however, remained a matter of corporate decision-making.
The distinction is important when assessing responsibility.
A company cannot reasonably be blamed for the presence of sea ice or fog.
It can reasonably be asked how its environmental safeguards were adapted when those conditions occurred.
PART THIRTEEN: THE INDEPENDENT OBSERVER’S MIXED ASSESSMENT
14. Professionalism and constructive corporate cooperation
The November 2018 meeting report records the findings of IUCN’s independent observer, Grigory Tsidulko.
His assessment acknowledged the professionalism of the company’s personnel, the quality of communications and the efforts of the marine mammal observers.
He had received the access necessary to perform his role.
The company reported 187 separate marine mammal sightings during operations and 13 associated shutdowns.
These are documented examples of protective measures being implemented.
They contradict any suggestion that the survey proceeded entirely without environmental monitoring or regard for marine mammal protection.
15. Certain protections were nevertheless relaxed
The observer also identified a significant qualification.
As the operation fell behind schedule, the company made unilateral decisions to relax certain provisions of its modified monitoring plan.
The panel considered the timing of those changes particularly problematic.
More whales were then present in the feeding area, whereas the original conservation approach envisaged stronger individual protection as the feeding season progressed.
Primary source: WGWAP Nineteenth Meeting Report, printed pages 10–14, sections 3.2–3.4.
iucn-csg.org+1
PART FOURTEEN: THE FINAL SCIENTIFIC RECORD WAS SEVERELY LIMITED
16. A lost opportunity to improve future protection
On printed page 14 of the November 2018 meeting report, the panel recorded the scientific consequences of the difficulties encountered.
It acknowledged that no acoustic data had been collected and that the visual data obtained were very limited.
This is a particularly important finding.
It concerns not only the immediate implementation of environmental safeguards but also the loss of information that could have improved subsequent whale-protection measures.
The panel recommended further examination of the available observations, possible pooling of data from different years and improvements in future monitoring under poor-visibility conditions.
The original report therefore records two distinct problems:
The Russian authorities prevented acoustic monitoring, while operational and environmental difficulties affected implementation of the remaining protective arrangements.
The two should not be conflated.
PART FIFTEEN: WERE RUSSIAN MILITARY INTERESTS RESPONSIBLE?
17. The independent evaluation examined the possibility
In November 2018, Chris Allan and David Gordon produced an independent evaluation of the Western Gray Whale Advisory Panel.
The report examined the acoustic permitting controversy on printed pages 41–42.
It recorded differing stakeholder views concerning whether sufficient efforts had been made to challenge the refusal.
Some interviewees attributed the decision to possible Russian military interests.
However, the evaluators expressly acknowledged:
“It is not possible for this evaluation to judge the validity of these statements.”
That qualification is decisive.
The independent report did not authenticate evidence demonstrating military involvement.
No Russian military order, security directive or equivalent official document establishing the underlying motive has been obtained for this investigation.
Possible military influence must therefore remain an attributed and unverified explanation, not an established historical fact.
Independent source: Allan and Gordon — Independent Evaluation of the Western Gray Whale Advisory Panel, November 2018, printed pages 41–42 (PDF).
iucn-csg.org
PART SIXTEEN: THE EVALUATORS ALSO QUESTIONED THE RESPONSE OF SAKHALIN ENERGY AND IUCN
18. Could more have been done?
The independent evaluators did not simply accept that the governmental refusal ended the matter.
They questioned why Sakhalin Energy, after nearly 25 years of extensive involvement with the Russian authorities, had apparently been unable to communicate its concerns effectively to relevant decision-makers.
They also questioned whether IUCN had made sufficiently effective use of its governmental relationships.
Their criticism was therefore directed towards both organisations.
They considered that stronger governmental engagement might help prevent a recurrence, even if the immediate decision could not be reversed.
This was an independent evaluative judgment.
It does not establish that successful reconsideration was realistically available or that either organisation deliberately failed to pursue it.
The historical evidence nevertheless identifies an important weakness in the relationship between the scientific advisory process and governmental authorities.
iucn-csg.org
PART SEVENTEEN: THE POTENTIAL IMPLICATIONS FOR INTERNATIONAL LENDERS
19. Environmental commitments and financial accountability
The same independent evaluation raised concerns about the implications of incomplete monitoring for Sakhalin Energy’s commitments to its lenders.
The agreed monitoring plan formed part of the company’s wider environmental protection arrangements.
Its incomplete implementation therefore raised questions extending beyond the relationship between the operator and the scientific advisory panel.
However, this investigation has not obtained the complete financing agreements, any applicable exemptions or waivers, or a formal lender determination concerning the 2018 survey.
It would consequently be inappropriate to declare that Sakhalin Energy was legally in breach of its financing arrangements.
The documentary finding is that the independent evaluators identified a potential compliance issue deserving examination.
PART EIGHTEEN: NOVEMBER 2018 — THE WHALES’ CONSERVATION STATUS IMPROVED
20. Encouraging evidence must also be recognised
On 14 November 2018, IUCN announced that the western gray whale subpopulation had been moved from Critically Endangered to Endangered on its Red List.
The announcement coincided with the advisory panel’s nineteenth meeting in Moscow.
The improvement reflected encouraging evidence of population recovery following historical overexploitation.
IUCN acknowledged the importance of international cooperation, protection from commercial whaling and conservation measures involving scientists, industry and governments.
It also emphasised that industrial development and commercial fishing remained potential threats.
Primary institutional source: IUCN — Fin Whale, Mountain Gorilla Recovering Thanks to Conservation Action, 14 November 2018.
IUCN
The announcement received contemporaneous coverage in the maritime press.
Contemporaneous reporting: The Maritime Executive — Whale Conservation Success Highlighted in IUCN Red List Update, 14 November 2018.
maritime-executive.com
This positive conservation development should not be overlooked.
Equally, an improvement in the population’s conservation classification does not retrospectively establish the adequacy of every industrial monitoring programme.
PART NINETEEN: SUBSEQUENT SCIENCE QUALIFIED EARLIER CORPORATE ASSURANCES
21. The research published in October 2022
As examined in earlier instalments, Glenn Gailey and colleagues subsequently published research concerning the extensive seismic and vessel activities undertaken near Sakhalin in 2015.
Their analysis identified associations between cumulative industrial sound exposure and reduced whale density within affected areas.
The study examined a wider industrial environment involving multiple activities.
It did not establish that Sakhalin Energy’s individual operations caused a particular adverse outcome.
Nevertheless, the research demonstrates why earlier corporate assurances concerning the absence of measurable effects should be understood within their original scientific and methodological context.
New research can produce findings that were not available when earlier assessments were made.
Peer-reviewed source: Gailey and colleagues — Gray Whale Density During Seismic Surveys Near Their Sakhalin Feeding Ground, 18 October 2022.
PMC
PART TWENTY: THE BRITISH HIGH COURT HAD ALREADY RECOGNISED THE ENVIRONMENTAL STAKES
22. A decade before the acoustic permit refusal
On 17 March 2008, Mr Justice Mitting delivered judgment in:
Export Credits Guarantee Department v Friends of the Earth [2008] EWHC 638 (Admin).
The proceedings concerned access to British government information associated with proposed export-credit support for Sakhalin II.
Support for approximately $650 million in project finance had been sought.
In paragraph 3, the judge recognised the potentially serious consequences of the development for the western gray whales and their habitat.
The judgment demonstrates the longstanding public importance of transparency concerning the project’s environmental implications.
It does not determine the legality of the Russian government’s 2018 permit refusal.
Nor does it establish a legal obligation under Russian law to permit deployment of acoustic monitoring equipment.
Judicial source: Export Credits Guarantee Department v Friends of the Earth [2008] EWHC 638 (Admin), judgment of 17 March 2008.
vLex United Kingdom
PART TWENTY-ONE: THE PRESENT OPERATOR’S ACCOUNT
23. What Sakhalin Energy currently says about whale protection
The present Sakhalin Energy operator maintains a publicly accessible account of its gray whale monitoring programme.
It describes the successful implementation of protective arrangements during seismic surveys in 2015, 2018 and 2022.
It also reports that no marine mammal incidents have been registered offshore northeastern Sakhalin since the project commenced.
The company’s position deserves inclusion in the documentary record.
However, its general account does not resolve the historical questions concerning the 2018 acoustic permitting refusal, the absence of field measurements or the relaxation of certain mitigation provisions.
Nor does an absence of registered incidents establish an absence of every potential behavioural or longer-term biological effect.
Corporate source: Sakhalin Energy — Gray Whale Monitoring Programme.
Gray Whale Monitoring Programme
EDITORIAL ANALYSIS
24. The three separate categories of responsibility
The 2018 episode illustrates why responsibility must be allocated carefully.
Governmental responsibility
The Russian permitting authorities refused authorisation for an important scientific monitoring activity.
The underlying reason remains unverified.
Corporate responsibility
Sakhalin Energy had to determine whether to proceed with its industrial operation under modified arrangements and how to respond to subsequent environmental and operational difficulties.
Its governmental constraints deserve recognition, but they do not remove the need to examine decisions that remained within its control.
Scientific and institutional responsibility
IUCN and the advisory panel had to determine whether continued participation could improve protection under the circumstances or whether it might be interpreted as endorsing an inadequate monitoring programme.
Their decision to remain engaged preserved a degree of independent scrutiny.
The historical records demonstrate the difficulty of balancing these competing considerations.
In the view of the Donovan–Shell Archive, the legitimacy of each organisation’s response should be assessed against its actual powers, responsibilities and available alternatives.
25. The contradiction within governmental environmental oversight
The Russian authorities exercised regulatory power over offshore industrial operations.
They also exercised authority over the deployment of scientific monitoring equipment.
The 2018 events illustrate what can happen when those two regulatory functions produce conflicting outcomes.
An industrial operation received the necessary environmental approval to proceed.
Yet scientists were prevented from collecting information intended to help verify an important aspect of its environmental performance.
This does not establish that the relevant Russian authorities acted unlawfully.
There may have been governmental considerations that have not entered the accessible documentary record.
Nevertheless, the practical conservation consequence was that the independent scientists lost an important means of evaluating the underwater environment experienced by the whales.
26. Why the distinction between modelling and measurement matters
Scientific modelling is an indispensable tool in modern environmental assessment.
It allows researchers to investigate possible conditions, design protective measures and anticipate circumstances that cannot readily be reproduced experimentally.
But models depend upon assumptions.
Those assumptions include the characteristics of the equipment, the physical environment and the relationships between different variables.
Field measurements allow scientists to test those assumptions.
The discrepancy discovered during the 2018 survey illustrates why verification matters.
The company detected and corrected the problem, and the retrospective assessment was reassuring.
That is favourable evidence.
Nevertheless, a system relying entirely upon predicted sound levels lacks the independent confirmation that contemporaneous measurements could provide.
27. Shell’s position deserves a balanced assessment
The evidence examined does not justify blaming Shell for the Russian government’s refusal.
Indeed, the record contains substantial evidence that Sakhalin Energy worked constructively with its scientific advisers and attempted to compensate for the missing measurements.
Shell’s historical association with the project makes the episode relevant to an investigation of its environmental legacy.
But relevance must not be confused with proof of direct responsibility.
The question deserving further examination is whether Shell, as a substantial shareholder and former controlling participant, possessed information or influence that could have assisted in resolving the difficulty.
No authenticated internal Shell correspondence addressing that specific question has yet been obtained for this instalment.
DOCUMENTARY CHRONOLOGY
18 April 2007: Gazprom acquires majority control of Sakhalin Energy. Shell retains a 27.5% interest.
17 March 2008: British High Court judgment recognises the potential environmental significance of Sakhalin II for the western gray whales.
2015: Sakhalin Energy conducts a seismic survey incorporating acoustic monitoring and independent observation.
15 June 2016: IUCN publishes the independent observer’s broadly favourable assessment of the 2015 survey.
7 March 2017: IUCN announces the renewed five-year scientific advisory agreement with Sakhalin Energy.
November 2017: The scientific advisory panel approves the developing environmental monitoring arrangements for the 2018 survey.
March 2018: Further technical preparations take place. The panel subsequently learns of the acoustic permit refusal.
30 April 2018: An emergency scientific teleconference examines the governmental decision and possible alternatives.
17 May 2018: The panel publishes its statement concerning the acoustic monitoring controversy.
24 May 2018: Sakhalin Energy’s formal response is received. The panel’s co-chairs respond to the company’s proposed alternative arrangements.
9 June 2018: The revised Monitoring and Mitigation Plan is dated.
Summer 2018: Seismic operations proceed without the planned acoustic monitoring. A modelling discrepancy is discovered and corrected. Adverse weather contributes to operational difficulties.
November 2018: The independent evaluation examines the permitting controversy and governmental engagement.
14–16 November 2018: The advisory panel reviews implementation of the 2018 survey and identifies lessons for future operations.
14 November 2018: IUCN announces the improvement of the western gray whale subpopulation’s conservation classification from Critically Endangered to Endangered.
October 2022: Further scientific research concerning earlier industrial activities is published.
28 November 2026: The Donovan–Shell Archive examines the surviving documentation and identifies outstanding questions concerning governmental authority, corporate responsibility and scientific verification.
DOCUMENTARY FINDINGS
Established: Shell held a substantial minority interest in Sakhalin Energy during the period examined.
Established: Sakhalin Energy and its independent scientific advisers developed an environmental monitoring programme incorporating underwater acoustic measurements.
Established: The Russian authorities refused permission for deployment of the planned acoustic monitoring equipment.
Established: The refusal affected both real-time and archival recording arrangements.
Established: The scientists considered whether recording equipment could operate under arrangements involving strict Russian security control of the data.
Established: Sakhalin Energy stated that it had been prepared to implement the original monitoring plan.
Established: The operator introduced precautionary adjustments to its acoustic modelling.
Established: The scientific co-chairs acknowledged constructive efforts to address the situation but maintained that field measurements were necessary for direct verification.
Established: During the survey, a discrepancy between the modelled and actual equipment configuration was identified and corrected.
Established: The subsequent assessment did not identify missed whale-related shutdowns attributable to that discrepancy.
Established: Adverse weather contributed to operational delays and difficulties with visual monitoring.
Established: The company relaxed certain provisions of its modified monitoring programme.
Established: The independent observer acknowledged the operator’s professionalism and constructive cooperation while identifying shortcomings.
Established: The independent evaluation raised concerns about governmental engagement and potential implications for lender commitments.
Not established: The precise underlying reason for the Russian government’s refusal.
Not established: That Russian military or intelligence authorities ordered the permit refusal.
Not established: That Shell directed or encouraged the refusal.
Not established: That Shell independently ordered relaxation of the subsequent mitigation measures.
Not established: That the absence of acoustic monitoring caused the death or injury of any particular whale.
Not established: That Sakhalin Energy was legally in breach of its financing agreements.
Not established: That every potential environmental consequence of the 2018 survey was successfully identified.
QUESTIONS FOR SHELL, SAKHALIN ENERGY, IUCN AND THE RELEVANT RUSSIAN AUTHORITIES
The documentary record suggests several matters worthy of clarification.
1. What was the precise legal and administrative basis for refusing the 2018 acoustic monitoring permit?
2. Does the original written governmental refusal survive, and can it be made available?
3. Were Russian military or security considerations involved, and if so, what documentary evidence establishes their relevance?
4. Was Shell informed of the permitting difficulty through its shareholder or technical-service arrangements?
5. Did Shell or Gazprom seek clarification or reconsideration from the Russian authorities?
6. Were the implications of proceeding without acoustic monitoring formally communicated to the project’s lenders?
7. Did the lenders issue any determination, consent or waiver concerning the modified monitoring programme?
8. What arrangements were subsequently introduced to prevent similar governmental permitting difficulties?
9. Have all surviving environmental monitoring records from the 2018 survey been preserved for future scientific examination?
10. Could Shell assist in locating historical correspondence relevant to the permit refusal and the subsequent corporate response?
These are requests for information and documentary clarification. They are not allegations of deliberate misconduct.
CONCLUSION: ENVIRONMENTAL PROTECTION REQUIRES GOVERNMENTAL COOPERATION AS WELL AS CORPORATE COMMITMENT
The 2018 Sakhalin seismic survey provides an instructive example of the limitations of voluntary environmental safeguards when governmental authorities prevent an important element of their implementation.
Sakhalin Energy and its scientific advisers had developed a comprehensive monitoring programme.
The company maintained that it was ready to implement that programme.
The Russian authorities refused the necessary permission for underwater acoustic monitoring.
The operator responded with more precautionary computer modelling.
The independent scientists acknowledged the value of those efforts while maintaining their reservations.
Subsequent events demonstrated the difficulty of proceeding under such constrained arrangements.
An equipment-modelling discrepancy was discovered and corrected.
Adverse weather complicated visual monitoring.
Certain protective provisions were relaxed.
The resulting scientific record was substantially less complete than originally intended.
It would be unfair to attribute every one of these difficulties to Shell.
It would also be misleading to present the survey as having proceeded exactly in accordance with the original scientific arrangements.
The documentary record is more complicated than either interpretation.
Its most important lesson concerns the relationship between environmental protection and the exercise of governmental authority.
Companies can finance scientific research.
Independent scientists can develop sophisticated monitoring programmes.
International conservation organisations can facilitate cooperation.
But if the government exercising regulatory authority prevents essential scientific measurements, the effectiveness of those arrangements may be compromised.
The protection of endangered species therefore requires more than cooperation between scientists and industrial operators.
It also requires governmental decisions that recognise and accommodate legitimate conservation research.
The western gray whales had no influence over the regulatory dispute.
Their feeding grounds remained exposed to industrial activities regardless of the administrative arrangements governing the scientists.
Permission to undertake an industrial operation should be accompanied by adequate arrangements to measure and evaluate its potential environmental consequences.
That is the central conservation lesson of the 2018 Sakhalin episode.
PRINCIPAL DOCUMENTARY SOURCES
1. Royal Dutch Shell plc — Annual Report and Form 20-F 2007. Authenticated corporate ownership and regulatory disclosures.
United States Securities and Exchange Commission — original filing
2. Royal Dutch Shell plc — Annual Report and Form 20-F 2018. Printed page 31, confirming Shell’s continuing minority interest.
3. IUCN — 15 June 2016. Independent observer’s assessment of the 2015 seismic survey.
Original institutional publication
4. IUCN — 7 March 2017. Renewal of the independent scientific advisory agreement.
5. Western Gray Whale Advisory Panel — 17 May 2018. Original bilingual statement concerning the Russian acoustic monitoring permit refusal.
Original six-page document (PDF)
6. Sakhalin Energy — May 2018. Corporate response concerning the inability to undertake acoustic monitoring.
Original corporate document (PDF)
7. Western Gray Whale Advisory Panel Co-Chairs — May 2018. Scientific response to the company’s explanation.
Original bilingual correspondence (PDF)
8. Updated Monitoring and Mitigation Plan — 9 June 2018. Particularly printed pages 5 and 8–9.
Original 92-page document (PDF)
9. Allan and Gordon — Independent Evaluation of the Western Gray Whale Advisory Panel, November 2018.Particularly printed pages 41–42.
Original independent evaluation (PDF)
10. Western Gray Whale Advisory Panel — Nineteenth Meeting Report, November 2018. Particularly printed pages 9–14.
Original scientific meeting report (PDF)
11. IUCN — 14 November 2018. Announcement of the improvement in western gray whale conservation status.
Original institutional announcement
12. The Maritime Executive — 14 November 2018. Contemporaneous maritime press reporting.
Whale Conservation Success Highlighted in IUCN Red List Update
13. Gailey and colleagues — Environmental Monitoring and Assessment, October 2022.
Gray Whale Density During Seismic Surveys Near Their Sakhalin Feeding Ground
14. British High Court — 17 March 2008.
Export Credits Guarantee Department v Friends of the Earth [2008] EWHC 638 (Admin)
15. IUCN Cetacean Specialist Group — recovered historical archive.
Western Gray Whale Advisory Panel Archive, 2004–2022
16. Sakhalin Energy — present corporate environmental account.
Gray Whale Monitoring Programme
DOCUMENTARY DISCLAIMER
This independent investigation is based on publicly accessible original corporate publications, regulatory filings, bilingual scientific correspondence, independent evaluations, contemporaneous reporting, peer-reviewed research and judicial records.
Several central original documents have been visually examined in addition to examination of their searchable text.
Shell’s historical minority shareholding is distinguished from the operational responsibilities of Sakhalin Energy and the regulatory authority of the Russian government.
The permit refusal is documented in contemporaneous scientific and corporate records. The original governmental refusal notice has not been independently obtained.
Possible Russian military involvement is identified solely as an unverified explanation discussed in the independent evaluation. It is not represented as established fact.
The acoustic modelling discrepancy was corrected, and the favourable retrospective assessment is expressly acknowledged.
No allegation is advanced that Shell directed the governmental refusal, deliberately concealed scientific information or caused the death or injury of any particular whale.
Potential implications for lender commitments are distinguished from a legally established contractual breach.
The British High Court proceedings concerned British governmental environmental-information disclosure and did not determine the legality of the subsequent Russian permitting decision.
Shell plc, Gazprom, Sakhalin Energy LLC, IUCN, the relevant Russian authorities, former advisory panel members, scientific contractors and project-financing institutions are invited to provide documentary corrections, additional evidence and attributed responses for fair consideration.
The website’s general disclaimer also applies.
NEXT IN THE SHELL LEAKS FILES
SLF-2007-133 — THE SAKHALIN PAPERS CXXIII
The Nets That Threaten the Whales — An Independent Investigation into Commercial Fishing, Entanglement and the Environmental Risks Beyond Shell’s Operations
On 11 October 2018, while scientists were still examining the consequences of Sakhalin’s industrial activities, IUCN announced the publication of important research concerning another threat to the endangered gray whales.
Commercial fishing nets.
The underlying scientific paper referred to earlier photographic research identifying signs of fishing-gear interactions on 28 of 150 living gray whales examined near Sakhalin Island.
Researchers identified coastal salmon set nets as a particularly serious conservation concern.
The scientists recommended restrictions on the deployment of such equipment near the whales’ feeding grounds and migration routes.
Advance documentary sources:
NOAA Fisheries — institutional repository copy.
IUCN — Western Gray Whales at Great Risk from Salmon Nets, 11 October 2018.
repository.library.noaa.gov+1
The next instalment will examine documented fishing-related injuries, the geographical overlap between commercial fisheries and whale habitat, the limitations of historical mortality records and the responsibilities of governmental authorities.
It will also consider why a balanced history of Shell’s environmental legacy must recognise significant threats to the whales that cannot reasonably be attributed to the oil and gas industry.
The central documentary question will be:
Can the endangered gray whales be adequately protected from industrial disturbance if other potentially lethal activities within the same marine environment remain insufficiently controlled?
The investigation will contribute to the conservation chapters of the forthcoming book:
SHELL, SAKHALIN AND THE ENDANGERED GRAY WHALES
Corporate Power, Environmental Controversy and the Secret History of Russia’s Sakhalin II Project.
The Sakhalin Papers continue.